Upgrade Overview for BIG-IQ Versions 5.4.0, 6.0.0, or 6.0.1 with a
Data Collection Device Cluster to Version6.1.0
Manual Chapter :
Upgrade Overview for BIG-IQ Versions 5.4.0, 6.0.0, or 6.0.1 with a
Data Collection Device Cluster to Version6.1.0
Applies To:
Show Versions
BIG-IQ Centralized Management
6.1.0
Upgrade Overview for BIG-IQ Versions 5.4.0, 6.0.0, or 6.0.1 with a
Data Collection Device Cluster to Version
6.1.0
Upgrading v5.4.0, 6.0.0, or 6.0.1 with a data collection device
cluster to v6.1.0
What BIG-IQ setup does this upgrade process support?
The following upgrade process to BIG-IQ Centralized Management version
6.1.0
is for system setups that
currently have version 5.4.0, 6.0.0, or 6.0.1 installed, and include a data collection
device cluster. If your system is not currently running version 5.4.0, 6.0.0, or 6.0.1 or
does not include a data collection device cluster, refer to
Supported Upgrades Processes to BIG-IQ Current Version
on
support.f5.com
.
What happens during a BIG-IQ upgrade to the latest
version?
This example represents a BIG-IQ setup
that includes a high-availability (HA) pair of BIG-IQ systems and a data collection
device (DCD) cluster. During the upgrade, all devices in the DCD cluster are
deactivated until they are all upgraded. During this time, data is not collected
from the managed BIG-IP devices. Data collection resumes when all of the devices in
the DCD cluster are upgraded and restarted.
BIG-IQ pre-upgrade checklist
To ensure that your upgrade goes smoothly, F5 recommends that you
perform a few system checks. Perform this test at least a day or so before you upgrade
in case you discover any issues that take longer than expected to resolve. Going through
this list ahead of time gives you a chance to resolve any issues before the clock is
ticking on your upgrade window.
Verify that the software version of the BIG-IP devices managed
by the BIG-IQ you are updating are at or beyond the minimum supported version. (For
details on how to do this, refer to the AskF5 article K34133507 on
support.f5.com
.)
If you plan to gather performance analytics for the BIG-IP
devices managed by the BIG-IQ you are updating, confirm that the managed devices are
at or beyond version 13.1.1, and provisioned with the AVR service.
Check that you have sufficient disk space for the upgrade. To
calculate the disk space you need, make sure you include the space your current
installation consumes and the extra amount needed for the upgrade.
If the
var
partition for any of the devices in your cluster was
extended before you upgraded, you must extend the
var
partition for that device
before the upgrade can succeed.
(For details on how to do this check,
refer to
Check the volume sizes on your current BIG-IQ
installation
and
Check the volume sizes
required by the software you want to install
in
F5 BIG-IQ Centralized Management Disk Space
Management
on
support.f5.com
. For details on how to extend a disk volume, refer to
Resizing VE Disk Volume Workflows
in
F5 BIG-IQ Centralized Management Disk Space
Management
on
support.f5.com
).
Verify that your BIG-IQ VE has sufficient memory and CPUs for
the configuration that you plan to deploy. (For details on how to do this, refer to
Determine the resources required for
deployment
in
Planning and Implementing a
BIG-IQ Centralized Management Deployment
on
support.f5.com
).
Examine the health of the devices you plan to upgrade. Make sure
to inspect the BIG-IQ primary and secondary devices as well as each DCD in the
cluster. (For details on how to do this, refer to
Check
the health of devices in a DCD cluster
in
Planning and Implementing a BIG-IQ Centralized Management Deployment
on
support.f5.com
).
Re-activate the licenses on the devices you plan to upgrade to
make sure that the service contract date is up to date. Make sure to do this for the
BIG-IQ primary and secondary devices, as well as each DCD in the cluster. (For
details on how to do this, refer to the F5 Knowledge Center article
K15365
on
support.f5.com
).
Confirm the zone configuration of the DCDs that you plan to
upgrade and for the devices managed by the BIG-IQ systems you plan to upgrade. If a
device is configured to be in a zone that does not have DCDs in it, statistics for
that device will not be collected after the upgrade.
To view the zone configuration for a DCD, navigate to
System
BIG-IQ DATA COLLECTION
BIG-IQ Data Collection
Devices
and note the zone.
To view the zone configuration for a device, navigate to
Devices
, click
the name of the device, then click
STATISTICS COLLECTION
and
note the zone.
Summary of tasks to
upgrade BIG-IQ and a DCD cluster from version 5.4.0, 6.0.0, or 6.0.1 to version
6.1.0
The upgrade process consists of the following phases, where each phase
includes a series of tasks.
Preparing for an upgrade:
Download the latest version of the BIG-IQ software image
from the F5 Downloads site.
Upload the latest version of the BIG-IQ software image to
the primary BIG-IQ.
Upgrade your system.
Upgrade the primary BIG-IQ and the data collection devices to
the latest version.
Upload the latest version of the BIG-IQ software image to the
secondary BIG-IQ.
Upgrade the secondary BIG-IQ to the latest version.
Complete your post-upgrade procedures.
Add the secondary BIG-IQ back to the primary BIG-IQ.
Re-discover devices and re-import services (You can do this
either manually or using a script).
Upgrade applications to enable statistics visibility (relevant
only to upgrades from BIG-IQ version 5.4).
Re-discover devices and re-import services (You can do this
either manually or using a script).
If you plan to deploy applications to a VMware cloud
environment, install the vCenter host root certificate on BIG-IQ.