Manual Chapter : Getting Started with BIG-IQ Virtual Edition

Applies To:

Show Versions Show Versions

BIG-IQ Centralized Management

  • 7.1.0
Manual Chapter

Getting Started with BIG-IQ Virtual Edition

What is BIG-IQ Virtual Edition?

BIG-IQ Virtual Edition (VE) is a version of F5 BIG-IQ Centralized Management that runs as a
guest
on specifically-supported hypervisors. BIG-IQ VE emulates a hardware-based BIG-IQ system running a VE-compatible version of BIG-IQ software.

BIG-IQ VE compatibility with
Microsoft Azure

The BIG-IQ Virtual Edition (VE) software includes support for a growing list of public and private cloud platforms. For a list of the supported platforms, refer to the BIG-IQ Virtual Edition Supported Platforms matrix.
This BIG-IQ version only supports the
Instance types
identified in this guide. Installation attempts on unsupported platforms might not be successful.

Hypervisor guest definition requirements

The
Azure
virtual machine guest environment for the BIG-IQ Virtual Edition (VE), at minimum, must include:
  • a 64-bit EC2 instance with at least 4 virtual cores (up to 16 are supported in this release)
  • at least 32 Gb RAM (64 Gb has been tested, F5 recommends at least 2 Gb per virtual core)
  • 2 virtual network adapter cards (NICs)
    F5 recommends three or more network adapters for most topologies, but the minimum requirement is two (one for management and one for traffic).
If you do not supply at least the minimum virtual configuration limits, it produces unexpected results.
The resources required for a BIG-IQ virtual machine depend to some degree on what you intend to do with it. Refer to
Determine the resources required for deployment
on
support.f5.com
for details.
Currently, these requirements map to the following list of Microsoft instance types.
  • A4mv2
  • B4ms
  • D4v3
  • D4sv3
  • E4v3
  • L4s
The instance types that you can select vary, depending on the region in which you deploy the BIG-IQ VE. Refer to
https://azure.microsoft.com/en-us/pricing/details/cloud-services/
to see pricing and availability detail for the region you plan to use.

Determine your image and resource requirements

The BIG-IQ Virtual Edition (VE) software images available for download are available in two images sizes. Once installed and configured, the standard image makes 120 Gb of disk space available for storage and the large image provides 500 Gb.
If you choose the 500 Gb image, only 120 Gb of the 500 Gb is allocated initially. You must allocate extra disk space beyond 120 Gb before you can use it. Usually, the extra storage space is for DCDs. However, there are also situations in which BIG-IQ systems can use the extra space. For example, you might want to store a large number of UCS backups. Or, your business needs might require you to store multiple versions of the BIG-IP or BIG-IQ software so you can move back and forth between BIG-IP or BIG-IQ versions. If needed, you can also expand the available disk space up to 1.9 Tb. The optimal size for your installation depends on how you plan to use it.
In BIG-IQ version 7.1.0, the size requirement for the /var directory increased from 10 to 25 Gb. If you are updating from a previous version, you might need to allocate additional disk space to accommodate this requirement.
The following table lists the minimum resources for deploying a BIG-IQ. Refer to
When does a BIG-IQ system need additional resources?
and
When does a DCD need additional resources?
(below) for guidance on when you need to exceed these minimums.
Minimum resource requirements per BIG-IQ deployment
Deployment type
Device Type
CPU
RAM
Disk Space
BIG-IQ deployment with statistics collection enabled, as well as alerts and events.
BIG-IQ
8
32 Gb
Generally, 120 Gb; or 500 Gb if extra space is needed.
DCD
8
32 Gb
Initially, 500 Gb. VE disk space can be extended further as needed.
BIG-IQ deployment with alerts and events enabled.
BIG-IQ
8
32 Gb
Generally, 120 Gb; or 500 Gb if extra space is needed.
DCD
8
32 Gb
Initially, 500 Gb. VE disk space can be extended further as needed.
BIG-IQ deployment without statistics collection, alerts, or events.
BIG-IQ
8
32 Gb
Generally, 120 Gb; or 500 Gb if extra space is needed.
License Manager.
BIG-IQ
4
32 Gb
120 Gb
F5 has tested the CPU, RAM and disk space combinations listed in the table. Other higher allocations may be possible. Generally, increasing CPU and RAM support more managed devices, services, or data collection (events, alerts, statistics), and increasing disk space to store more data on the BIG-IQ or DCDs.

When does a BIG-IQ system need additional resources?

When the number of BIG-IP devices you are managing from BIG-IQ deployment exceeds the specified thresholds, F5 recommends that you allocate 8 CPUs and 64 Gb of RAM to your BIG-IQ systems.
The following table lists the threshold for each BIG-IP service, depending on the number of BIG-IP devices you are managing.
A BIG-IQ managing devices
Needs 64 Gb to manage more than:
provisioned with Access
32 devices
provisioned with ADC
80 devices
provisioned with ASM
40 devices
provisioned with DNS
100 devices
provisioned with FPS
50 devices
deployed in a VMware service scaling group
100 devices
deployed in an AWS or Azure service scaling group
50 devices
This is a rough approximation. Depending on the number of objects on each BIG-IP device. When your managed BIG-IP devices are provisioned with multiple modules, the RAM requirement increases.

When does a DCD need additional resources?

For a broader consideration of the factors that can impact the CPU, RAM, and disk space requirements for DCD devices, refer to the
BIG-IQ Centralized Management DCD Sizing Guide
.
For work flows that describe how to manage your disk space, refer to the
BIG-IQ Centralized Management: Data Collection Device Disk Space Management Guide
on
support.f5.com
.

DCD Image Sizing Considerations

TMOS (the architecture underlying BIG-IP and BIG-IQ) imposes a size limit of 1.9Tb for each BIG-IQ VE. When you calculate how many BIG-IQ VE instances your solution requires based on data storage, it's important to understand how much of that 1.9Tb is available for data storage.
  • TMOS reserves half of the disk for upgrades.
  • Space consumed by your data's Elasticsearch replicas cuts the effective storage in half again.
So of the 1.9Tb maximum disk size, approximately 450 Gb is available for data storage on each BIG-IQ DCD.
There are a couple more image size factors to consider:
  • F5 does not support external data storage of BIG-IQ data except for backups and snapshots.
  • F5 in-house testing confirms up to 20 DCDs in one Elasticsearch cluster.
For additional sizing detail or to download sizing tools, refer to
BIG-IQ: Sizing Guidelines
on
support.f5.com