Manual Chapter :
Upgrading BIG-IQ Overview
Applies To:
Show VersionsBIG-IQ Centralized Management
- 7.1.0
Upgrading BIG-IQ Overview
Upgrading BIG-IQ to the latest version
What BIG-IQ setup does this upgrade process
support?
This process supporting upgrading BIG-IQ version 6.0.0 through 7.0.0. This process details an upgrade of a system configuration without a data collection device (DCD) cluster.
If your BIG-IQ is not currently running one of these versions, or
includes a DCD, refer to the supported upgrade paths section in the release notes
for this BIG-IQ version.
What happens during a BIG-IQ upgrade
This example represents a BIG-IQ in a high availability configuration. During the upgrade, the BIG-IQ suspends BIG-IP device management. This can result in a downtime of services. The amount of downtime depends on the size of your system's setup. BIG-IQ services resume when the active BIG-IQ is upgraded and restarted.
BIG-IQ pre-upgrade checklist
To ensure that your upgrade goes smoothly, F5 recommends that you
perform a few system checks. Perform this test at least a day or so before you upgrade in
case you discover any issues that take longer than expected to resolve. Going through this
list ahead of time gives you a chance to resolve any issues before the clock is ticking on
your upgrade window.
- Verify that you have completed the pre-upgrade tasks. These are detailed in the articleTasks to complete before you start the upgrade processonsupport.f5.com.)
- Verify that your statistics are prepared for migration to the upgraded system. For more information, see Prepare statistics for upgrade.
- Verify that the software version of the BIG-IP devices managed by the BIG-IQ you are updating are at or beyond the minimum supported version. (For details on how to do this, refer to the AskF5 article K34133507 onsupport.f5.com.)
- Depending on the version of BIG-IQ software you are upgrading from, the connectivity requirements for your BIG-IQ system may be different in the version you are upgrading to. Refer to K15612 onsupport.f5.comto confirm that the ports you need are configured correctly.
- If you plan to gather performance Analytics data for the BIG-IP devices managed by the BIG-IQ you are updating confirm that the managed devices are at or beyond version 13.1.1, and provisioned with the AVR service.
- If you have custom settings for the DCD statistics data collection retention or aggregation, these custom settings are not automatically retained over the upgrade process. Save your data retention and aggregation settings before you begin the upgrade, so you can manually enter your custom settings, once your upgrade is complete. See.
- Check that you have sufficient disk space for the upgrade. For version 7.1.0, the minimum disk space requirement increased by 10%. When you calculate the extra amount of space required for this update, make sure to consider:
- the amount of space your current installation consumes
- the space needed for the upgrade
- an additional 10% to meet this new requirement.
If thevarpartition for any of the devices in your cluster was extended before you upgraded, you must extend thevarpartition for that device before the upgrade can succeed.(For details on how to check the size of theFor version 7.1.0 and later, thevarpartition needs to be at least 2.5 times larger than it needed to be for earlier BIG-IQ versions.varpartition on your system, refer toCheck the volume sizes on your current BIG-IQ installationandCheck the volume sizes required by the software you want to installinF5 BIG-IQ Centralized Management Disk Space Managementonsupport.f5.com. For details on how to extend a disk volume, refer toResizing VE Disk Volume WorkflowsinF5 BIG-IQ Centralized Management Disk Space Managementonsupport.f5.com). - Verify that your BIG-IQ VE has sufficient memory and CPUs for the configuration that you plan to deploy. (For details on how to do this, refer toDetermine the resources required for deploymentinPlanning and Implementing a BIG-IQ Centralized Management Deploymentonsupport.f5.com).
- Examine the health of the devices you plan to upgrade. Make sure to inspect the BIG-IQ primary and secondary devices as well as each DCD in the cluster. (For details on how to do this, refer toCheck the health of devices in a DCD clusterinPlanning and Implementing a BIG-IQ Centralized Management Deploymentonsupport.f5.com).
- Re-activate the licenses on the devices you plan to upgrade to make sure that the service contract date is up to date. Make sure to do this for the BIG-IQ primary and secondary devices, as well as each DCD in the cluster. (For details on how to do this, refer to the F5 Knowledge Center articleK15365onsupport.f5.com).
- Confirm the zone configuration of the DCDs that you plan to upgrade and for the devices managed by the BIG-IQ systems you plan to upgrade. If a device is configured to be in a zone that does not have DCDs in it, statistics for that device will not be collected after the upgrade.If the BIG-IQ system you are upgrading includes multiple zones, then in addition to the three DCD minimum, there must also be at least two DCDs in each zone before you can perform a rolling upgrade procedure.
- To view the zone configuration for a DCD, navigate toand note the zone.
- To view the zone configuration for a device, navigate toDevices, click the name of the device, then clickSTATISTICS COLLECTIONand note the zone.
Tasks to complete before you start the upgrade process
Before upgrading F5 BIG-IQ Centralized Management, complete these
tasks.
Tasks | Additional information |
---|---|
Download the latest BIG-IQ software image and
Pre-upgrade Check tool from the F5 Downloads site. | To ensure that the pre-upgrade
script runs correctly, make sure you always download the latest version of
the tool from downloads.f5.com . |
Prepare your statistics for the upgrade
process | See Prepare statistics for upgrade. If your BIG-IQ CM is in an HA pair, ensure that
this process is completed on each node. |
Run the pre-upgrade check script on the primary
BIG-IQ by typing the following commands:
| This script verifies the following for BIG-IQ:
For additional detail about this
script, refer to the AskF5 article K15988343 on support.f5.com . |
Depending on the version of BIG-IQ software you are
upgrading from, the connectivity requirements for your system may be different
in the version you are upgrading to. Refer to the AskF5 Knowledge Center
article K15612: Connectivity requirements for the
BIG-IQ system on support.f5.com to confirm that the ports you need are configured
correctly. | Additional information on network connectivity
requirements is available in the Planning and
Implementing a BIG-IQ Deployment on support.f5.com |
Deploy any staged configuration changes to your managed BIG-IP devices. | When addressing configuration conflicts for each BIG-IP device, F5 recommends you use BIG-IP to override the configuration settings stored on BIG-IQ. |
Decide which disk volume you want to install the BIG-IQ software on. You must have at least two volumes to upgrade BIG-IQ. | If you don't have two volumes, you can add the second volume as part of the upgrade. |
If you are currently using a self-IP address for
device discovery, make a note of that IP address. | You'll need to enter that IP address when you
perform setup after you upgrade and reboot the BIG-IQ system. |
Upgrade all managed BIG-IP
devices to version 12.1 or later. | For you to manage BIG-IP
devices from BIG-IQ Centralized Management, the BIG-IP devices must be running
version 12.1 or later. |
Run the following command to view all daemons
running on the BIG-IQ, and their status: admin@(ip-10-1-1-4)(cfg-sync
Standalone)(Active)(/Common)(tmos)# show /sys service . | Make a note of the daemons running on BIG-IQ and
their status. After the upgrade, verify that all daemons are running as
expected. |
Summary of tasks to upgrade BIG-IQ to the latest version
The upgrade process can take up to
several hours depending on how many BIG-IP devices you are managing.
To upgrade F5 BIG-IQ Centralized Management, perform these
procedures. Upgrading BIG-IQ to the most recent version requires that you update its
configuration to incorporate new features that have been introduced. It's a good idea
to set aside at least several hours to complete this process.
It is important that you follow these tasks in the order
stated.
- Remove standby BIG-IQ from active BIG-IQ.
- Upgrade the primary BIG-IQ.
- Upload the BIG-IQ software image to the standby BIG-IQ and upgrade it.
Complete the post-upgrade process
- Add the secondary BIG-IQ to the active BIG-IQ to re-establish the HA configuration.
- Upgrade the BIG-IP framework on your managed devices.
- Rediscover your BIG-IP devices, and re-import their services.
- If you have a VMware service scaling group configured, you'll need to re-install the vCenter host root certificate on BIG-IQ.