Guidelines for NEBS platforms
This information applies to the Network
Equipment-Building System (NEBS) version of the this platform:
- This equipment meets NEBS requirements per GR-63-CORE.
- This equipment is suitable for installation in these locations:
- Network Telecommunication Facilities
- Locations where the National Electrical Code (NEC) applies
The intra-building interfaces of
this platform, including Ethernet, are suitable for connection to
intra-building or unexposed wiring or cabling only with shielded and
grounded cables at both ends. The intra-building ports of the equipment
must not be connected metallically to interfaces that connect to the
outside plant (OSP) or its wiring.
You should coat bare conductors with
an appropriate antioxidant compound before you make crimp connections. You
should bring all unplated connectors, braided strap, and bus bars to a
bright finish and then coat them with an antioxidant before you connect