Applies To:
Show VersionsBIG-IP LTM
- 16.1.1, 16.1.0, 16.0.1, 16.0.0, 15.1.4, 15.1.3, 15.1.2, 15.1.1, 15.1.0, 15.0.1, 15.0.0, 14.1.4, 14.1.3, 14.1.2, 14.1.0, 14.0.1, 14.0.0, 13.1.4, 13.1.3, 13.1.1, 13.1.0, 13.0.1, 13.0.0, 12.1.6, 12.1.5, 12.1.4, 12.1.3, 12.1.2, 12.1.1, 12.1.0, 12.0.0, 11.6.5, 11.6.4, 11.6.3, 11.6.2, 11.6.1, 11.6.0, 11.5.10, 11.5.9, 11.5.8, 11.5.7, 11.5.6, 11.5.5, 11.5.4, 11.5.3, 11.5.2, 11.5.1
BIG-IQ Centralized Management
- 6.1.0, 6.0.1, 6.0.0, 5.4.0
1 System Report
The System Report provides comprehensive details about all system hardware components, including:
- Serial number
- F5® part number
- Host information
- BIOS version
- Firmware version
- Bootloader version
- Processor, processor version
- Power supply firmware version
- Memory in each socket
- Total memory
- Storage drives
When you start the test, you see this message:
Test Begin: System Report
After the report completes successfully, a summary of information displays, and you see this message:
Test Complete: System Report: PASSED
2 Transceiver Report
This test checks for transceiver modules installed in the system and reports this information about those modules:
- Vendor name
- Part number
- Revision
- Media type
When you start the test, you see this message:
Test Begin: Transceiver Report
After the report completes successfully, you see this message:
Test Complete: Transceiver Report: PASSED
3 Sensor Test
This sensor test performs the hardware sensor test on both the motherboard and the switchboard, if applicable, and displays this information:
- Host temperatures
- Host voltages
- Mezzanine temperature
- Mezzanine voltages
- CPU temperature
- CPU fan speeds
- SuperIO temperatures
When you start the test, you see this message:
Test Begin: Sensor Test
After the report completes successfully, you see this message:
Test Complete: Sensor Test: PASSED
4 Memory Test
This test verifies the system memory, including this information:
- Error count
- Hardware incident count
- Memory copy rate
When you start the test, you see this message:
Test Begin: Memory Test
After the test completes successfully, you see this message:
Test Complete: Memory Test: PASSED
5 Drive Test
This test verifies the internal status of installed storage drives, including this information:
- Read error rate
- Start/Stop count
- Re-allocated sector count
- Power on hours count
- Spin-up retry count
- Drive calibration retry count
- Drive power cycle count
- Offline scan uncorrectable sector count
- Ultra ATA CRC error rate and multi-zone error rate
When you start the test, you see this message:
Test Begin: Drive Test
After the test completes successfully, you see this message:
Test Complete: Drive Test: PASSED
6 Packet Path Test
This test verifies the internal paths to test the Ethernet interfaces in the system, including between the front panel switch, HSBs, processors, and more.
When you start the test, you see this message:
Test Begin: Packet Path Test (excluding modules)
After the test completes successfully, you see this message:
Test Complete: Packet Path Test (excluding modules): PASSED
7 Power Supply Test
This test reports status about the power supplies installed in the system, including information about the supply manufacturer, voltage, and current and temperature measurements.
When you start the test, you see this message:
Test Begin: Power supply Test
After the test completes successfully, you see this message:
Test Complete: Power supply Test: PASSED
8 Fan Test
This test reports status about the fan trays installed in the system.
When you start the test, you see this message:
Test Begin: Fan Test
After the test completes successfully, you see this message:
Test Complete: Fan Test: PASSED
9 Config Module Test
This test verifies the internal paths to test the configuration modules installed in the system.
When you start the test, you see this message:
Test Begin: Config Module Test
After the test completes successfully, you see this message:
Test Begin: Config Module Test
20 LED Test
This test sets each of the possible LED status levels, and prompts you to verify the corresponding color and operation. You must perform this test from the LCD panel.
When you start the test, you see this message:
Test Begin: Host LED test
After the test completes successfully, you see this message:
Test Complete: Front Port LED test: PASSED
21 LCD Keypad Test
When you start the test, you see this message:
Test Begin: LCD test Flashing the F5 logo ball to assist with locating the chassis... Please answer all questions on the DUT's LCD screen. When the test is finished, the content of the log will be displayed below. Test Start Test Begin: LCD test Flashing the F5 logo ball to assist with locating the chassis... Please answer all questions on the DUT's LCD screen. When the test is finished, the content of the log will be displayed below. Test Start
After the test completes successfully, you see this message:
Test Complete: LCD Test: PASSED
A Run All (Non-Interactive) Tests
This option runs all tests that are applicable to the system, excluding the interactive tests.
This process takes approximately a half hour.
B Run tests in [A] but exclude test 4 (System Memory Test)
This option runs all tests that are applicable to the system, excluding the interactive tests and the System Memory test.
D Display Test Report Log
This option displays a test report. A report log is stored as the text file /shared/log/eud.log in the host file system.
S Display Test Summary
This option displays a test summary report that contains the results of all tests run during a test session.
Q Quit EUD and Reboot the System
This option quits the EUD and reboots the system.