Manual Chapter : About Advanced Resource Assign

Applies To:

Show Versions Show Versions

BIG-IP APM

  • 15.0.1, 15.0.0
Manual Chapter

About Advanced Resource Assign

The Advanced Resource Assign action enables assignment of resources.
An Advanced Resource Assign action provides these configuration elements and options:
Resource type
Specifies a type of resource (one per tab), and on each tab provides a check list or radio button list of such resources for selection. Resource types include: Network Access, Portal Access, App Tunnels, Remote Desktops, Static ACLs, SAML, Webtops, Webtop Links, Webtop Sections, and Static Pools.