Manual Chapter :
About Advanced
Resource Assign
Applies To:
Show VersionsBIG-IP APM
- 15.0.1, 15.0.0
About Advanced
Resource Assign
The Advanced Resource Assign action enables assignment of resources.
An Advanced Resource Assign action provides these configuration elements and
options:
- Resource type
- Specifies a type of resource (one per tab), and on each tab provides a check list or radio button list of such resources for selection. Resource types include: Network Access, Portal Access, App Tunnels, Remote Desktops, Static ACLs, SAML, Webtops, Webtop Links, Webtop Sections, and Static Pools.