Updated Date: 07/07/2026
Preparing to Upgrade Devices in Your DCD Cluster and the BIG-IQ with Minimal Downtime
Downloading a software image from F5 Networks is the first step to making it available to install on the BIG-IQ system.
Important:
The BIG-IQ disk space compatibility check is not supported for BIG-IQ hotfix images. To avoid errors, download a standard BIG-IQ .iso image.
-
Log in to the F5 Downloads site,
downloads.f5.com. -
Click the Find a Download button.
-
Click the name of the product line.
-
Click the product name, Centralized Management.
-
Click the version number you want to download.
-
Read the End User Software License agreement and click the I Accept button if you agree with the terms.
-
Click the BIG-IQ version
<version number>``.isofile name that you want to download. -
Click the name of the closest geographical location to you.
The software image downloads to your local system.
The software image is now available for you to upload to BIG-IQ to make it available for this upgrade.
Before you can upload the software image to the BIG-IQ system, you must have first downloaded it from the F5 Downloads site, downloads.f5.com.
You upload the BIG-IQ version software image to the primary BIG-IQ system to make it available for this upgrade.
-
At the top of the screen, click System.
-
On the left click Software Management > IMAGES.
-
Click the Upload Image button.
-
Click the Choose File button and go to the location to which you downloaded the image, and click the Open button to upload it to BIG-IQ.
Before you start the upgrade process, confirm that your managed BIG-IP devices can send alerts or events to more than one device in the Data Collection Device cluster so that when a particular device in the Data Collection Device cluster is being upgraded, data automatically routes to another device in the Data Collection Device cluster.
-
Review the data routing configuration for all of the managed BIG-IP devices that send data to your DCD cluster. If you find a BIG-IP device that is configured to send data to only one device in a DCD cluster, change that configuration before proceeding. Refer to the BIG-IP device documentation on
support.f5.comfor details on how to configure the BIG-IP device for DCD cluster routing. -
Review the monitoring configuration for all of the managed BIG-IP devices that send data to your DCD cluster. Make sure that each BIG-IP device is configured to send data to an alternate device in the DCD cluster if another device goes offline. If you find a BIG-IP device that is not configured with appropriate monitors, change that configuration before proceeding. Refer to the BIG-IP device documentation on
support.f5.comfor details on how to configure BIG-IP monitors correctly.