Applies To:
Show VersionsBIG-IQ Centralized Management
- 5.1.0, 4.6.0
What you need to do before you upgrade from BIG-IQ version 4.5 or 4.6 to BIG-IQ version 5.1
Required Task | Notes |
---|---|
Re-activate the BIG-IQ system license. You must do this on both the active and the standby BIG-IQ if they are running in an HA pair. | For specific instructions about how to reactivate a license, refer to the F5® BIG-IQ® Central Management: Licensing and Initial Setup guide. |
Create a UCS backup of the BIG-IQ system's current configuration and store it on a remote server. | You can restore this saved backup only to BIG-IQ running version 4.5 or 4.6. You cannot restore a backup file for BIG-IQ version 4.5 or 4.6 onto BIG-IQ running version 5.1. |
Decide which disk volume you want to install the upgrade on. You must have at least two volumes to upgrade BIG-IQ. | If you are running BIG-IQ Virtual Edition and you don't have two volumes, refer to: SOL17406: Using the tmsh utility to create a new software volume for installing a new image or hotfix on the BIG-IQ system at: https://support.f5.com/kb/en-us/solutions/public/17000/400/sol17406.html |
Upgrade all managed BIG-IP devices to version 11.5.2 or later. | SOL14592: Compatibility between BIG-IQ and BIG-IP releases at https://support.f5.com/kb/en-us/solutions/public/14000/500/sol14592.html |
To make sure you've deployed all pending changes that you want to keep after upgrade,
for each functional area:
|
For more information about this process, review the documentation associated with the functionality you're deploying changes for. |
After you upgrade to BIG-IQ version 5.1, some collected data and reports might not be compatible with the new version of BIG-IQ. You'll need to reconfigure some settings for certain functionality that was not retained during the upgrade process. Refer to the section titled, After you upgrade to BIG-IQ version 5.1.
How to upgrade from BIG-IQ version 4.5 or 4.6 to BIG-IQ version 5.1
To upgrade F5® BIG-IQ® Centralized Management from BIG-IQ version 4.5 or 4.6 to version 5.1, you perform these procedures.
- Complete all of the pre-requisites outlined in the section titled, What you need to do before you upgrade to BIG-IQ version 5.1.
- Download the BIG-IQ version 5.1 iso file from the F5 Downloads site to your desktop.
- Upload the software image to BIG-IQ.
- Remove the secondary BIG-IQ system from the primary BIG-IQ system, if they are configured in an HA pair.
- Upgrade the primary BIG-IQ system, if they are configured in an HA pair.
- Discover and import services for managed devices.
- Upgrade the secondary BIG-IQ system, if they are configured in an HA pair.
- Re-establish the HA configuration, if they are configured in an HA pair.
- Re-specify configuration settings for some BIG-IQ functionality as outlined in the section titled, After you upgrade to BIG-IQ version 5.1.
Download the BIG-IQ version 5.1 software image from F5 Networks
Upload the BIG-IQ version 5.1 software image to BIG-IQ version 5.0
Upload the BIG-IQ version 5.1 software image to make it available for this upgrade.
Remove the secondary BIG-IQ version 5.0 from an HA pair
Upgrade the primary BIG-IQ version 4.5 or 4.6 to BIG-IQ version 5.1
You need at least two volumes to upgrade BIG-IQ® Centralized Management. If you are running BIG-IQ Virtual Edition and don't have two volumes, refer to: SOL17406: Using the tmsh utility to create a new software volume for installing a new image or hotfix on the BIG-IQ system at support.f5.com/kb/en-us/solutions/public/17000/400/sol17406.html
Before upgrading BIG-IQ, download the BIG-IQ version 5.1 .iso image from the F5 downloads site.The upgrade process involves installing the new version of the software, booting into that new version, and reviewing the settings on the setup screens.
Upgrade the BIG-IP REST framework
To properly communicate, BIG-IQ® Centralized Management and BIG-IP® devices need to be running compatible versions of the REST framework. If the REST frameworks are incompatible, BIG-IQ displays a yellow triangle next to the device in the BIG-IP Device inventory. It might take a few minutes for BIG-IQ to check the framework on all the BIG-IP devices.
Discover and import services for managed devices after upgrade
After all of your devices are in an active and running state, you should upgrade the secondary BIG-IQ system. Refer to the Upgrade the Secondary BIG-IQ topic.
Upgrade the secondary BIG-IQ version 4.5 or 4.6 to BIG-IQ version 5.1
After you upgrade the primary BIG-IQ® Centralized Management system to version 5.1 and discover and import services for your managed devices, you can upgrade the secondary BIG-IQ system in a HA configuration. You must have command-line access to upgrade the secondary BIG-IQ system.
You need at least two volumes to upgrade BIG-IQ. If you are running BIG-IQ Virtual Edition and you don't have two volumes, refer to: SOL17406: Using the tmsh utility to create a new software volume for installing a new image or hotfix on the BIG-IQ system at support.f5.com/kb/en-us/solutions/public/17000/400/sol17406.htmlRe-establish the HA configuration after upgrading to BIG-IQ version 5.1
- Log in to primary BIG-IQ system with your administrator user name and password.
- At the top left of the screen, select System Management from the BIG-IQ menu.
- At the top of the screen, click Inventory.
- On the left, click BIG-IQ HA.
- Click the Add Device button.
- In the IP Address field, type the BIG-IQ system's self IP address.
- In the User name and Password fields, type the administrative user name and password for the system.
- Click the Add button to add this device to this high availability configuration.
After you upgrade to BIG-IQ version 5.1
Some settings and configurations are not compatible between F5® BIG-IQ® Centralized Management version 4.5 or 4.6, and version 5.1. After you upgrade to BIG-IQ version 5.1, you need to re-specify configuration settings for any of the (following, listed) functionality that you were using before you upgraded.
System Management
- SMTP server settings, except for email recipients, which persist after upgrading.
- Backup Schedules, including retention policies, when upgrading from BIG-IQ version 4.5
directly to version 5.1. Note: If you upgrade from BIG-IQ version 4.6 to version 5.1, the Backup Schedules and retention policies are retained. Refer to the BIG-IQ version 5.1 release notes for more information.
- BIG-IQ Logging, logging nodes, and logging configuration
Device Management
- Backup Schedules, including retention policies, when upgrading from BIG-IQ version 4.5
directly to version 5.1. Note: If you upgrade from BIG-IQ version 4.6 to version 5.1, the Backup Schedules and retention policies are retained. Refer to the BIG-IQ version 5.1 release notes for more information.
Audit Logging:
- Archive Settings
Change Management:
- Configuration Snapshots
- Evaluate & Deploy
Network Security:
- Notification Rules and Notification Schedules
- Change Verification Reports
- Web Application Security event logs created in a previous version of BIG-IQ are not compatible with BIG-IQ version 5.1.
Global User Settings
- Reverts to default settings