Manual :
BIG-IQ Centralized Management: Upgrading Version 6.0 with a Data Collection Device Cluster to Version 6.0.1 with Minimal Downtime
Applies To:
Show VersionsBIG-IQ Centralized Management
- 6.0.1
Original Publication Date: 08/10/2018
- Upgrading BIG-IQ Version 6.0 with a Data Collection Device Cluster to Version 6.0.1 with Minimal Downtime
- Preparing to Upgrade the Devices in Your DCD Cluster and the BIG-IQ with Minimal Downtime
- Upgrading the Devices in Your DCD Cluster and the BIG-IQ with Minimal Downtime
- Upgrading the Secondary BIG-IQ
-
Restore the BIG-IQ and DCD Cluster to Pre-upgrade State
- What are the post-upgrade tasks?
- Re-discover devices and re-import services
- Re-discover devices and re-import LTM, ASM, AFM, and DNS services in bulk using a script
- Use a script to remove and recreate access groups in bulk for devices running APM services
- Re-import access groups (without SWG data) from the user interface for devices running APM services
- Remove and recreate access groups (with SWG data) from the user interface for devices running APM services
- Troubleshooting Minimal Downtime Upgrade Issues
- Legal Notices