Manual :
F5 BIG-IQ Centralized Management: Upgrading a 5.2 or 5.3 DCD Cluster to Version 5.4 With Minimal Downtime
Applies To:
Show Versions
BIG-IQ Centralized Management
- 5.4.0
Original Publication Date: 12/27/2017
- Data Collection Device Cluster Upgrade Overview
- Prepare for Data Collection Device Upgrade with Minimal Downtime
-
Upgrade the Data Collection Devices in Your Cluster with Minimal Downtime
- Prerequisites for upgrading the data collection device to the latest version
-
Upgrade the data collection devices to the latest version
- Upload the latest version of the BIG-IQ software image
- Stop sending alerts to the DCD
- Deactivate data collection services
- Upgrade the data collection devices to the latest version
- Confirm that the upgraded DCD is back in service
- Reactivate data collection services after upgrade
- Bring the data collection device back online
-
Upgrading BIG-IQ Centralized Management with Data Collection Devices to the Latest Version
- What you need to do before you upgrade BIG-IQ from version 5.x to 5.4
- Remove the secondary BIG-IQ from the HA pair
- Upload the BIG-IQ software image to the secondary BIG-IQ system
- Install the latest version of BIG-IQ software on the HA peer
- Upload the latest version of the BIG-IQ software image
- Upgrade the primary BIG-IQ system to the latest version
- Completing Post-Upgrade Processes
- Troubleshooting Minimal Downtime Upgrade Issues
- Legal Notices