Applies To:
Show VersionsBIG-IQ Centralized Management
- 5.2.0, 5.1.0, 5.0.0
What you need to do before you upgrade BIG-IQ from version 5.x to 5.2
Before upgrading F5® BIG-IQ® Centralized Management, perform the following tasks.
Tasks | Additional information |
---|---|
Re-activate the BIG-IQ system license. | You must do this on both the active and the secondary BIG-IQ if they are running in an HA pair. For specific instructions about how to reactivate a license, refer to the F5® BIG-IQ® Central Management: Licensing and Initial Setup guide. |
Create a backup of the BIG-IQ system's current compressed user configuration set (UCS) and store it on a remote server. | The UCS file includes: system-specific configuration files, license, user account and password information, and SSL certificates and keys. You can use this backup in the event you want to restore to the previous version of BIG-IQ. |
Decide which disk volume you want to install the upgrade on. You must have at least two volumes to upgrade BIG-IQ. | If you are running BIG-IQ Virtual Edition and you don't have two volumes, refer to: K1740617406: Using the tmsh utility to create a new software volume for installing a new image or hotfix on the BIG-IQ system at: support.f5.com/csp/article/K17406 |
Deploy any staged configuration changes to your managed devices. |
This step is required only if you are going to use the script to re-discover and re-import BIG-IP devices and services after the upgrade (as outlined in the section titled, Re-discover devices and re-import services in bulk using a script). You must deploy configuration changes you have staged for your devices if you use this script, because they'll be overwritten on BIG-IQ after you run the script. If you'd rather re-discover devices and re-import services from the BIG-IQ user interface (instead of in bulk) so you can address any potential configuration conflicts for each BIG-IP device, refer to the section titled, Re-discover devices and re-import services from the user interface. |
Gather the following information:
Required information | For my configuration |
---|---|
You'll need to create a passphrase for the Master Key. The passphrase must
contain:
|
|
Get the discovery address you specified on the BIG-IQ system during setup. This is the same IP address that the peers in a high availability confirmation use to communicate. You can find this IP address on the BIG-IQ HA screen. | |
Get your BIG-IQ administrator and root passwords. | |
Get the name for the secondary HA BIG-IQ system if configured in an HA pair. |
If you're currently running a version of BIG-IQ prior to version 5.0, you must first upgrade to version 5.0 before you can upgrade to version 5.2. For more information, refer to the guide titled, F5 BIG-IQ Centralized Management: Upgrading BIG-IQ to Version 5.0.
If you're upgrading BIG-IQ Logging Nodes, refer to the guide titled, F5 BIG-IQ Centralized Management: Upgrading Logging Nodes to version 5.2.
Summary of procedures to upgrade BIG-IQ from version 5.x to 5.2
To upgrade F5® BIG-IQ® Centralized Management from BIG-IQ version 5.x to 5.2, perform these procedures. Upgrading BIG-IQ to the most recent version requires an update to its configuration to incorporate new features introduced. It's a good idea to set aside at least a few hours to complete this process.
- Complete all of the pre-requisites outlined in the topic titled, What you need to do before you upgrade BIG-IQ from version 5.x to 5.2.
- Download the BIG-IQ version 5.2 iso file from the F5 Downloads site to your desktop.
- Upload the software image to the primary BIG-IQ system.
- If configured in an HA pair:
- Remove the secondary BIG-IQ system from the primary BIG-IQ system (if configured in an HA pair).
- Upgrade the primary BIG-IQ system.
- Upload the software image to the secondary BIG-IQ system.
- Install the new software on the secondary BIG-IQ system.
- Re-establish the HA configuration.
- Upgrade the BIG-IP framework on your managed devices.
- Re-discover devices and re-import LTM, ASM,
AFT, and DNS services. Or, remove and recreate or reimport access groups for devices running APM
services.Note: You have the option to use a script from the command line to re-discover and re-import services (in bulk) for devices running LTM, ASM, AFM, and DNS or individually through the BIG-IQ user interface. For devices running the APM service, you must remove and recreate access groups for devices running the APM service. For more information, refer to, Use a script to remove and recreate access groups in bulk for devices running APM services,Remove and recreate access groups (with SWG data) from the user interface for devices running APM services or Reimport access groups (without SWG data) from the user interface for devices running APM services.
Download the BIG-IQ version 5.2 software image from F5 Networks
Upload the BIG-IQ version 5.2 software image
Upload the BIG-IQ version 5.2 software image to your BIG-IQ system to make it available for this upgrade.
Remove the secondary BIG-IQ from the HA pair
Upgrade the primary to BIG-IQ version 5.2
You need at least two volumes to upgrade F5® BIG-IQ® Centralized Management. If you are running BIG-IQ Virtual Edition and don't have two volumes, refer to: K17406: Using the tmsh utility to create a new software volume for installing a new image or hotfix on the BIG-IQ system at support.f5.com/csp/article/K17406.html
Before upgrading BIG-IQ, download the BIG-IQ version 5.2 .iso image from the F5 downloads site. Be sure to have your Master Key pass phrase handy; you'll need it after you reboot.Upgrade BIG-IQ to take advantage of the newest functionality and features..
Upload the BIG-IQ version 5.2 software image
Upload the BIG-IQ version 5.2 software image to your BIG-IQ system to make it available for this upgrade.
Install version 5.2 on the secondary BIG-IQ system
After you upgrade the primary BIG-IQ® Centralized Management system to version 5.2, you can upgrade a secondary BIG-IQ system for an HA configuration.
You need at least two volumes to install BIG-IQ software. If you are running BIG-IQ Virtual Edition and you don't have two volumes, refer to: K17406: Using the tmsh utility to create a new software volume for installing a new image or hotfix on the BIG-IQ system at https://support.f5.com/csp/article/K17406.Re-establish the HA configuration after upgrading to BIG-IQ version 5.2
Even though you can log in to the secondary BIG-IQ after the you re-establish the HA configuration, the system continues some database re-indexing processes in the background. For larger configurations, that can take up to an hour. If you perform any searches on objects before it's done re-indexing, BIG-IQ might not return the expected results. During this time, you can use the primary BIG-IQ.
Upgrade the BIG-IP framework
To properly communicate, BIG-IQ® Centralized Management and managed BIG-IP® devices must be running a compatible version of its framework. If the frameworks are incompatible, BIG-IQ displays a yellow triangle next to the device in the BIG-IP Device inventory.
When you upgrade a BIG-IP device running version 11.5.x to another 11.5.x version, or to an 11.6.x version (for example, from version 11.5.3 to 11.5.4, or from version 11.5.3 to version 11.6.1), you must upgrade the REST framework so BIG-IQ can manage the device.
When you upgrade BIG-IQ from version 5.x to 5.2, you must also upgrade the REST framework for all BIG-IP devices (currently in the BIG-IP Device inventory) running a version prior to 12.0.0.