Manual :
F5 BIG-IQ Centralized Management: Upgrading a 5.1 Logging Node Cluster to the Latest Version with Minimal Downtime
Applies To:
Show VersionsBIG-IQ Centralized Management
- 5.4.0
Original Publication Date: 07/13/2017
- Logging Node Cluster Upgrade Overview
- Prepare for Logging Node Upgrade with Minimal Downtime
-
Upgrade the Logging Nodes in Your Cluster with Minimal Downtime
- What you need to do before you upgrade the logging node from version 5.1 to the latest version
-
Upgrade the logging nodes to the latest version
- Upload the latest version of the BIG-IQ software image
- Stop sending alerts to the logging node
- Deactivate data collection services for version 5.1
- Upgrade the logging nodes to the latest version
- Confirm that the upgraded logging node is back in service
- Reactivate data collection services from 5.1 upgrade
- Bring the logging node back online
-
Upgrading BIG-IQ Centralized Management with Logging Nodes to the Latest Version
- What you need to do before you upgrade BIG-IQ from version 5.1 to the latest version
- Remove the secondary BIG-IQ from the HA pair
- Upload the latest version of the BIG-IQ software image
- Install the latest version of BIG-IQ software on the HA peer
- Upload the latest version of the BIG-IQ software image
- Upgrade the primary to the latest version of BIG-IQ software
- Enabling statistics collection after upgrading from 5.1
- Define external storage snapshots location
- Confirm that the upgraded primary BIG-IQ system is back in service
- Completing Post-Upgrade Processes
- Legal Notices